Serving Vancouver & the Lower Mainland

Bathroom Renovations Built to Stay Dry

Main bathrooms, ensuites, kids' baths and powder rooms rebuilt from the studs out, with a waterproofing system we flood-test before a single tile goes on.

  • ✓Waterproofing membrane flood-tested for 24 hours before tiling
  • ✓One fixed, itemised quote, tile, fixtures, glass and trades included
  • ✓Plumbing permits and strata alteration agreements handled for you
  • ✓Licensed & insured · $5M liability · WorkSafeBC registered · 2-year workmanship warranty
$22,000 – $38,000typical full main bathroom · 3–4 weeks on site

Free consultation · no deposit to get a price · reply within one business hour

Free bathroom renovation quote

Tell us which bathroom and what bothers you about it. We reply within one business hour.

Happy Clients
0 +
Liability Coverage
$ 0 M
Licensed & Insured
0 %
Years of Experiences
0 +

Budget · 2026

Budgeting for a Bathroom Renovation

What Vancouver bathrooms cost to renovate this year, installed. The two things that move a bathroom budget most are moving the plumbing and the tile you choose.

Price my bathroom
Bathroom scopeTypical costTime on site
Powder room refresh: vanity, toilet, tile, lighting$6,000 – $14,0001 – 2 weeks
Tub-to-shower conversion, shower area only$5,000 – $14,0001 – 2 weeks
Kids' or hall bathroom, full renovation$20,000 – $32,0003 – 4 weeks
Full main bathroom, same layout$22,000 – $38,0003 – 4 weeks
Condo bathroom (strata rules, fixed drains)$20,000 – $35,0003 – 5 weeks
Primary ensuite with double vanity and walk-in shower$38,000 – $70,0004 – 7 weeks
Luxury or custom spa bathroom / wet room$55,000 – $90,000+6 – 9 weeks
Curbless shower (recessed floor)add about $4,000+add 3 – 5 days
Moving a toilet, shower or vanity drainadd $2,000 – $6,000 per fixturevaries

Fixture allowances are shown separately in every quote so you can see exactly where the money goes. For conversions, see our tub-to-shower cost guide.

Find your bathroom

Condo, Post-War House or Character Home: Bathroom Scenarios

The building decides more than the tile does. Here is how each type of Vancouver home shapes the job.

Tower condo bathroom

Drains sit in the slab and the stack cannot move, so the layout usually stays. We focus on a curbless or low-curb shower, better ventilation and storage, inside strata hours.

Typical budget
$20k – $35k
On site
3 – 5 weeks
Strata approval
Needed

Vancouver Special main bath

Often a single 5-by-8 bathroom serving the whole upper floor. The fix is usually a tub-to-shower conversion or a second bathroom carved from the hall or a bedroom.

Typical budget
$22k – $45k
On site
3 – 5 weeks
Plumbing permit
If drains move

Character home bathroom

Uneven floors, old cast-iron stacks and lath walls. We level and sister the joists so large-format tile stays flat, and replace galvanised supply lines while the walls are open.

Typical budget
$35k – $70k
On site
5 – 7 weeks
Hazmat survey
Pre-1990 homes
Get a price for my bathroom Two bathrooms at once? Doing them together usually saves on trades and scheduling.

Homeowner feedback

Homeowner Feedback on Our Bathroom Work

Bathroom clients hold us to four things. Here is what past clients wrote on Google, word for word.

What bathroom clients hold us to

  • A flood test you can watch before tiling starts
  • Tile lines that land where the drawing said: layout set out before cutting
  • A working toilet every night in single-bathroom homes, wherever the layout allows
  • A fan that is actually ducted outside, sized for the room

Rated 5.0 by our clients

5.0from 21 Google reviews

Every review is on our Google Business Profile. Ask us and we will put you in touch with a past client near you.

★★★★★
We had Saj and his team help us do a full renovation of our townhouse. Saj and everyone from the plumber to the electricians and the painter were patient, kind and professional.
DesiFull townhouse renovation · Google review
★★★★★
Saj was great to work with, professional, responsive, and attentive to detail. I had specific requests on a few more challenging parts (not typical construction details), and they were executed as envisioned. The project stayed on budget and schedule, and I’m very happy with the results.
Alastair BirdCustom renovation · Google review
★★★★★
Saj and his team exceeded my expectations. I was not sure what to expect when we started the project. Everything was completed within budget and even early!
Susi BolenderFull renovation · Google review

One quote

Everything Your Bathroom Needs, Priced in a Single Quote

No separate bills from a tiler, a plumber and a glass company. One itemised quote covers every layer, from the subfloor to the last bead of silicone.

01 / Strip & check

Demolition to the studs

Old tile and board out, subfloor and joists inspected, rot and old repairs dealt with before anything is covered again.

02 / Rough-in

Plumbing & electrical

New valves, drains sloped properly, GFCI circuits, heated-floor wiring and a ducted exhaust fan.

03 / Waterproofing

Membrane & flood test

A continuous membrane system on walls, floor and niches, flood-tested for 24 hours before tile.

04 / Tile

Layout, setting & grout

Tile layout set out from the drawing, large-format tile on a flat substrate, epoxy or high-performance grout.

05 / Fixtures

Vanity, toilet, glass & lighting

Vanity and top, toilet, shower glass measured after tile, mirror, lighting and accessories installed.

06 / Handover

Caulk, clean & warranty

Silicone, final clean, a walkthrough with a deficiency list, and a written warranty.

How it unfolds

How a Bathroom Renovation Unfolds, From Demo to Final Tile

  1. 1

    Consultation and measure

    We look at the drain locations, the fan duct, the subfloor and what is under the tub before we talk tile.

    about 45 min
  2. 2

    Design and selections

    Layout drawing, tile and fixture selections, and a shower design that suits how you use the room.

    1 – 2 weeks
  3. 3

    Fixed quote and scheduling

    Itemised price with fixture allowances; long-lead items like glass and vanities ordered early.

    2 – 3 days
  4. 4

    Demolition and rough-in

    Strip to studs, fix the subfloor, new plumbing and electrical, inspections where required.

    4 – 6 days
  5. 5

    Waterproofing and tile

    Membrane, 24-hour flood test, then tile, grout and sealing.

    1 – 2 weeks
  6. 6

    Fixtures, glass and handover

    Vanity, toilet and trim, glass measured after tile, final clean and walkthrough.

    4 – 7 days

Waterproofing is the part you will never see

Most failed showers we tear out were tiled over drywall or a single coat of paint-on membrane with no test. We install a continuous membrane system across the walls, floor, niche and bench, lap every seam, then fill the shower pan and leave it for 24 hours. Only when the level has not moved does tile go on. If you are weighing a curbless shower, our curbless shower vs wet room guide explains the trade-offs.

Permits

Bathroom Permits: When You Need One

A like-for-like bathroom often needs no permit at all. The moment a drain moves or a new bathroom is created, the City of Vancouver wants to see it.

No permit

Same fixtures, same places

New tile, vanity, toilet and tub or shower in the existing locations are usually permit-free.

Plumbing permit

Moving or adding fixtures

Relocating a drain, converting a tub to a curbless shower with a new drain, or adding a bathroom needs a plumbing permit and inspection.

Strata first

Condos and townhouses

In a strata, an approved alteration agreement comes before any permit, and many buildings restrict where new drains and fans can go.

Questions

Bathroom Renovation FAQs

How much does a bathroom renovation cost in Vancouver?
A full main bathroom renovation in Vancouver typically costs $22,000 to $38,000 in 2026. Powder rooms run $6,000 to $14,000, primary ensuites $38,000 to $70,000, and luxury or wet-room projects $55,000 and up.
How long does a bathroom renovation take?
Three to four weeks on site for a standard full bathroom, after one to two weeks of design and ordering. Ensuites with custom glass or curbless showers take four to seven weeks.
How much is a tub-to-shower conversion?
For the shower area alone, most Vancouver conversions cost $5,000 to $14,000. A curbless walk-in shower costs more, often $12,000 to $20,000+, because the floor has to be recessed for the drain.
What should a kids' bathroom renovation include?
Durable porcelain tile, a tub kept for bathing young children, a comfort-height vanity with deep drawers, anti-scald valves, rounded edges and a fan on a timer. Budget $20,000 to $32,000 for a full renovation.
Can I stay home during a bathroom renovation?
Yes. If it is your only bathroom, tell us early, we sequence the work to keep a working toilet available overnight wherever the layout allows, and plan the shower downtime so it is as short as possible.
Do I need a permit to renovate a bathroom in Vancouver?
Not for replacing fixtures in the same positions. Moving drains, adding a bathroom or changing the structure needs a plumbing and possibly a building permit. Strata approval is needed in condos regardless.
What makes a bathroom renovation custom or luxury?
Custom millwork vanities, large-format or natural stone, frameless glass, curbless showers with linear drains, heated floors and thermostatic valves. In Vancouver these projects usually start around $55,000.
Do you warranty the waterproofing?
Yes. Our workmanship is covered by a 2-year written warranty, and the membrane is installed and flood-tested to the manufacturer's system requirements.

Where we work

Where We Renovate Bathrooms

Based in downtown Vancouver, we renovate bathrooms in houses, townhouses and condos across the Lower Mainland.

Other renovation services

Next step

Book Your Free Bathroom Consultation

We come to you, measure the room, look at what is under the tub and give you a fixed, itemised price. No deposit to get a quote.

No obligation · reply within one business hour · we never share your details

Book your bathroom consultation

About 45 minutes at your home, no obligation.

Visit or call

Our Office and Service Area

We are based downtown on West Hastings Street and renovate bathrooms across the City of Vancouver and the Lower Mainland.

Reimagine Construction and Renovation

Office
1021 W Hastings St
Vancouver, BC V6C 0B2
Service area
City of Vancouver and the Lower Mainland