West Vancouver renovations

West Vancouver Home Renovations

Post-and-beam houses in the British Properties, view homes above Dundarave and Ambleside family houses, renovated to make the most of the light and the view, with District permits and slope logistics planned from day one.

  • Scope built around views, glazing and indoor–outdoor flow
  • District of West Vancouver permits and tree bylaw checks handled
  • Licensed and insured, $5 million liability, WorkSafeBC registered
$250,000–$450,000typical whole home, similar layout · 5–7 months

Tell us about your West Vancouver home

The neighbourhood, the age of the house and what you want to change. We reply within one business hour.

Happy Clients
0 +
Liability Coverage
$ 0 M
Licensed & Insured
0 %
Years of Experiences
0 +

Choose your scope

Refresh, View Upgrade or Full Rebuild: Choosing Your West Vancouver Scope

The right scope depends on whether the house works and just looks tired, whether it hides its view, or whether it needs rebuilding inside.

01 / Refresh

Keep the plan, renew the finishes

Floors, paint, lighting, doors and a kitchen or bath update. Right when the layout already works.

Example budget
$80k–$160k
On site
8–12 weeks
02 / View upgrade

Open the house to the water

Remove walls that block sightlines, enlarge openings, add sliding glass to the deck and re-plan the main floor around the view.

Example budget
$180k–$350k
On site
4–6 months
03 / Full rebuild

Everything inside the shell

Structure, envelope upgrades, systems, layout and finishes. Common for 1960s–70s homes with original wiring, single glazing and dated plans.

Example budget
$450k–$900k+
On site
7–12 months

Reviews & credentials

From clients who trusted us with their homes

5.0from 21 Google reviews
Read every review on Google

Why West Vancouver homeowners hire Reimagine

  • 15+ years renovating homes across Greater Vancouver
  • Design-conscious team with an architectural background
  • $5 million liability coverage and WorkSafeBC registration
  • A single project lead from drawings to handover
★★★★★
Saj and his team exceeded my expectations. I was not sure what to expect when we started the project. Everything was completed within budget and even early!
Susi BolenderFull renovation · Google review
★★★★★
The Reimagine crew did a first class job removing my old laminate flooring and installing the new laminate. There were custom built-ins they had to deal with, removing, re-installing and finishing nicely.
Frank FureszLaminate with custom built-ins · Google review
★★★★★
The floor installation by Reimaging Construction was swift and flawless, leaving my space transformed with impeccable craftsmanship.
Samuel MaFloor installation · Google review

Quoted word for word from our Google Business Profile. Reviews cover projects across Metro Vancouver.

Pricing · 2026

West Vancouver Home Renovation Costs for 2026

Price my home

West Vancouver homes tend to be larger, on steeper lots and finished to a higher standard, so budgets sit above the Lower Mainland average. Glazing and structural changes for views are the biggest single variable.

Scope of workBudget rangeDuration
Cosmetic refresh, whole house$80,000–$160,0008–12 weeks
Kitchen and main-floor update$120,000–$220,0003–4 months
View upgrade: walls, openings, glazing$180,000–$350,0004–6 months
Whole home, similar layout$250,000–$450,0005–7 months
Full interior rebuild with structural work$450,000–$900,000+7–12 months
Lower-level suite or rec floor$130,000–$220,0003–5 months

Ranges reflect 2026 North Shore rates for West Vancouver's typical house sizes and finish levels. A fixed price follows the walkthrough and design.

Included in our quote

  • Design, drawings and structural engineering
  • Site protection on steep and landscaped lots
  • All trades, materials and finish allowances
  • District of West Vancouver permits and inspections
  • Final walkthrough and written warranty

Outside the quote

  • Arborist reports if protected trees are affected
  • Appliances, furniture and window coverings
  • Landscaping and hardscape
  • Hazardous-material abatement
  • Temporary accommodation

Local conditions

What Makes West Vancouver Renovations Different

The District, the terrain and the houses themselves all ask for more planning than a typical Lower Mainland renovation.

One municipality, careful reviews

Permits come from the District of West Vancouver. Projects that change the exterior, the footprint or protected trees need more review, so we check tree and siting questions before design is final.

Steep lots and long driveways

Deliveries, bins and crane or pump access are planned at the walkthrough. On many British Properties and Caulfeild lots, logistics are a real line item.

Mid-century houses

Many homes date from the 1950s–70s: post-and-beam framing, single glazing, original wiring and heating. Upgrading them respectfully is most of the work.

AmblesideDundaraveBritish PropertiesCaulfeildHorseshoe BayCypress ParkAltamontChartwellGlenmorePark RoyalSentinel HillEagle HarbourWhytecliffWestmount

Our West Vancouver service area

Map of West Vancouver

How it runs

Four Stages to a Finished West Vancouver Home

Every project follows the same four stages; the dates below are typical for a whole-home renovation.

  1. Walkthrough and site review

    House, lot, access, trees and view lines reviewed with you.

    Week 1–2
  2. Design and fixed quote

    Drawings, engineering and an itemised price, with two rounds of revisions.

    Weeks 3–8
  3. District permits

    Applications and any tree or siting review, with orders placed in parallel.

    Weeks 8–16
  4. Build and handover

    Construction, inspections, deficiency list and warranty.

    5–7 months on site

West Vancouver FAQs

What West Vancouver Clients Ask Before Signing

How much does a home renovation cost in West Vancouver?

A whole-home renovation that keeps the layout typically costs $250,000 to $450,000 in 2026. A cosmetic refresh starts around $80,000, and full interior rebuilds with structural changes run $450,000 to $900,000 or more.

Do I need a permit from the District of West Vancouver?

Structural changes, new openings, plumbing and electrical work and any change to the exterior or footprint need District permits. Like-for-like cosmetic work usually does not.

Will the tree bylaw affect my renovation?

Only if the work, access or staging affects protected trees. We check at the walkthrough and bring in an arborist when needed.

Can you open up the house to the view?

Usually. Removing a load-bearing wall or enlarging openings needs an engineered beam and permits, and we plan glazing sizes around what the structure allows.

How long does a West Vancouver whole-home renovation take?

Five to seven months on site for a similar-layout project, after two to four months of design and permits. Full rebuilds take longer.

Do you handle older post-and-beam homes?

Yes. We keep the character that makes them special while upgrading insulation, glazing, wiring and heating.

Next step

Talk Through Your West Vancouver Project

Tell us about the house and what you want it to become. We'll visit, walk the lot and give you a realistic scope and budget before any design fees.