New fronts, counters and lighting
Refacing or painting, new quartz, backsplash, lighting and hardware. The layout stays as it is.
- Typical budget
- $12k–$35k
- On site
- 1–3 weeks
West Vancouver kitchens
Kitchens that open to the view, custom cabinetry built for larger West Vancouver homes, and Ambleside condo kitchens rebuilt within strata rules, designed and delivered by one team.
Tell us about the room and what you would change. We reply within one business hour.
Kitchen services
From a cabinet refresh to a fully custom kitchen built around the view.
A full remodel in the existing footprint, finished to West Van standards.
Remodel prices →Ambleside and Dundarave units with strata-approved plans.
Condo kitchen scope →Full custom millwork, panel-ready appliances and tall storage.
Custom level →New fronts on solid boxes when a remodel isn’t needed yet.
Refresh prices →Natural stone and large-format slabs, delivered for steep driveways.
Stone costs →Walls removed to turn the kitchen toward the view.
Luxury level →Engineered hardwood run through kitchen and living areas.
Flooring details →Pro-style hoods ducted outside, layered lighting over islands.
Ask the designer →Three levels
The level you choose decides the cabinetry, the surfaces and whether the structure changes.
Refacing or painting, new quartz, backsplash, lighting and hardware. The layout stays as it is.
New semi-custom or custom cabinetry, stone, appliances, flooring and a ducted hood inside the existing room.
Fully custom millwork, large islands, panel-ready appliances, natural stone and walls removed to open the kitchen to the water.
West Vancouver and nearby
Kitchen and open-plan work from West Vancouver homes, alongside a nearby North Shore kitchen. Open a project for the full gallery.





Reviews & credentials
Saj was great to work with, professional, responsive, and attentive to detail. I had specific requests on a few more challenging parts (not typical construction details), and they were executed as envisioned. The project stayed on budget and schedule, and I’m very happy with the results.
Saj and his team exceeded my expectations. I was not sure what to expect when we started the project. Everything was completed within budget and even early!
The Reimagine crew did a first class job removing my old laminate flooring and installing the new laminate. There were custom built-ins they had to deal with, removing, re-installing and finishing nicely.
Quoted word for word from our Google Business Profile. Reviews cover projects across Metro Vancouver.
Pricing · 2026
West Vancouver kitchens are usually larger and finished to a higher level, so full remodels start higher than elsewhere in the Lower Mainland.
| Kitchen level | Budget range | Build time |
|---|---|---|
| Cabinet refacing and new counters | $12,000–$35,000 | 1–3 weeks |
| Condo kitchen (Ambleside, Dundarave) | $35,000–$65,000 | 5–7 weeks |
| Full remodel, same footprint | $55,000–$110,000 | 6–10 weeks |
| Open-plan conversion with beam | add $12,000–$30,000 | add 1–2 weeks |
| Custom luxury kitchen | $120,000–$250,000+ | 10–16 weeks |
| Integrated appliance package | $25,000–$60,000+ | supplied separately |
2026 ranges for West Vancouver. Your fixed price follows the in-home measure and design.
Local conditions
What changes a West Vancouver kitchen budget usually has little to do with the cabinets.
Same-footprint kitchens often need only trade permits. Removing walls, changing openings or adding gas lines needs District of West Vancouver permits and inspections.
Long cabinets, stone slabs and appliances have to get into the house. On steep British Properties and Caulfeild driveways, we plan delivery and staging first.
Many 1950s–70s West Vancouver homes have small panels, old wiring and galvanised or Poly-B plumbing. Upgrading them is part of most kitchen quotes here.
How it comes together
Four stages from the first measure to the final walkthrough.
Room, services, access and the view lines you want to keep.
Week 1Drawings, 3D rendering, cabinetry, stone and appliance choices.
Weeks 2–6District permits and cabinet production in parallel.
Weeks 6–14Demolition, rough-in, cabinets, stone, finishes and warranty.
6–10 weeks on siteKitchen FAQs
A full remodel in the same footprint typically costs $55,000 to $110,000 in 2026. Custom luxury kitchens start around $120,000, and refreshes can be done for $12,000 to $35,000.
Fully custom millwork, integrated panel-ready appliances, natural stone or large porcelain slabs, a ducted professional hood, layered lighting and often structural changes for an island or view.
Not for a same-footprint replacement. Structural changes, new openings, gas lines and added circuits need District permits.
Six to ten weeks on site for a full remodel, after four to eight weeks of design and ordering. Custom luxury kitchens take ten to sixteen weeks.
Yes. We prepare the strata alteration package and work within the building's hours; condo kitchens typically run $35,000 to $65,000.
Yes. We build from your designer's drawings or provide our own drawings and rendering.
Related pages
More kitchen pages: North Vancouver, Burnaby and Vancouver.
Plan it
Start with a measure and a conversation about how you cook and entertain. You get drawings, a rendering and a fixed price.
Finishes and value
Articles for the selection stage, when stone, cabinet style and resale value meet.
Quartz, granite, marble or porcelain, matched to how you cook.
Read the guide →GuideDoor styles that suit modern and West Coast homes.
Read the guide →GuideUpgrades buyers notice in a higher-end kitchen.
Read the guide →